久久国产综合精品麻豆|久久国产中文字亚洲幕|久久精品色婷婷国产福利|A级国产乱理伦片在线观看|国产精品日韩专区欧美动漫|日韩一区二区三区在线观看|国产精品 日韩 综合 图片|日本欧美一区二区三区不卡视频

Hello! Welcome to the Shenzhen ZhongAn Traffic Technology Co., Ltd official website!

24h Service Hotline:

13316950296

About US
Contact US

Service Hotline

86-0755-23020833

Contact: 

Manager Jiang  86-13316950296
Manager Xia     86-13169900590

Address:5/F, D2 Building,D zone, New Century co-prosperity Industrial Park, No. 2 Shihua Road, Shillong community, Shiyan Street,Baoan District, Shenzhen city, China 
Tel: 86 0755--23020833
Fax: 86 0755--23096233
URL: www.hwxc888.com

You are here:Home > About US > Common problem > Installation of traffic lights catenary (wood) a list of what needs attention
Installation of traffic lights catenary (wood) a list of what needs attention
Author:Shenzhen ZhongAn Traffic Technology Co., Ltd     Time:2016/6/12 15:08:09     Click:181
1. Check the vertical support required hole position, depth and diameter.
2. detect vertical or adjust vertical support. Backfill compaction test status.
3. Detection of cable anchor position.
4. supervise each anchor cable installation, determine the installation execution program consistent with the manufacturer's installation. Since the condition for underground installation method or vendor may not satisfy the conditions of minimum load bolt or bolts for all load test.
5. Check all cables vertical support hardware installation. In the pedestrian zone to ensure the cable hardware vertical or horizontal clearance.
6. Check the vertical support install all horizontal catenary, transmission lines and range lines. Confirm the location of compression insulator
7. Check the traffic lights, traffic signals across cables and transmission line installation. Confirm the minimum height above the road surface than the standard required by temporary means.